Jelly Production Line Yinrich GDQ 300
Jelly Production Line Yinrich GDQ 300 with equipment
Two sets of moulds (frogs and bears)
Line consist of following equipment:
– tanks for syrup boiling (5 pcs.)
– heating unit
– deposito (two rows of mould)
– cooling tunnell
– control cabinet
Capacity: 300 kg/h